Switchboard Upgrades Brisbane
Older switchboards weren't built for modern Brisbane households - induction cooking, ducted air, EV charging and high-draw appliances all push them past their design. ARKD installs premium Hager switchboards with full RCBO protection and surge protection, sized for the way you actually use power.

Most Brisbane homes still running ceramic-fuse boards or partial RCD setups need an upgrade - both for safety and capacity. We assess your existing main supply, sub-mains and circuit demand, then quote a fully compliant Hager board with RCBO protection on every circuit and a surge protection device on the main.
Switchboard upgrades are also the first step before adding an EV charger, an induction cooktop, or ducted air-conditioning. Doing it once, properly, avoids reactive call-outs every time you add a major load.
Every install is delivered to AS/NZS 3000 with a written testing sheet covering insulation, polarity, earth continuity and RCD operation - clean labelling, photographed for your records.
How a switchboard upgrade is planned
- Look at the existing board, main supply and the circuits it feeds
- Talk through what you run now and what you plan to add (EV charger, induction, ducted air)
- Confirm board location, access and any meter or supply coordination needed
- Provide a written quote covering the board, protection and testing
- Book the changeover, with power off for as short a window as practical
What to send with your enquiry
- A clear photo of the switchboard with the door open
- A photo of the meter box and its surroundings
- Your suburb and the type of property (house, unit, townhouse, commercial)
- Any appliances or additions you are planning
- For units: body corporate or building manager contact if access is needed
What affects the scope
Every board is different, so we quote after seeing what is there. The main factors are the number of circuits, the condition of existing wiring, whether the board needs relocating, space in the meter box, and any extra capacity you want for future loads. If we find something during the assessment that changes the scope, we tell you before any work starts.
Common questions
- Do I need to be home for a switchboard upgrade?
- Someone needs to give us access at the start and we will walk you through the board at the end. Power will be off for part of the day, so we will confirm timing with you when booking.
- Can you quote from photos?
- Photos of the board and meter box help us understand the job and give you an early idea of scope. For most upgrades we still confirm on site before finalising the quote.
- Should I upgrade before adding an EV charger or induction cooktop?
- Often it makes sense to look at both together. We assess the board's capacity first and tell you whether the new load can be added as-is or whether an upgrade is the better option.
- How long does a quote take?
- Quotes within 24 hours for small jobs. Larger projects take longer.
Ready to get started?
Quotes within 24 hours for small jobs. Larger projects take longer. Available 24/7 for emergencies.
